Thomas Lamprecht 0ccdd1b6a4 ui: bump sync/verify grid stateid
so that people get the improved view by default

Signed-off-by: Thomas Lamprecht <t.lamprecht@proxmox.com>
2020-10-31 10:58:57 +01:00
Thomas Lamprecht fb66c85363 ui: improve sync job view layout
Avoid overuse of flex, that is as bad as having all to fixed widths.

In spirit similar to the previous commit for the verify panel, see
that for some rationale.

Signed-off-by: Thomas Lamprecht <t.lamprecht@proxmox.com>
2020-10-31 10:56:51 +01:00
Thomas Lamprecht 6b7688aa98 ui: datastore: fix sync/verify job removal prompt
Signed-off-by: Thomas Lamprecht <t.lamprecht@proxmox.com>
2020-10-29 14:34:31 +01:00
Thomas Lamprecht 319fe45261 ui: datastore: rework sync layout, make job ID optional
Signed-off-by: Thomas Lamprecht <t.lamprecht@proxmox.com>
2020-10-28 21:25:30 +01:00
Dominik Csapak 028d0a1352 ui: move sync/verify jobs to the datastores
add the datastore as parameter for the store, remove
the datastore selector for the edit windows and give the datastore
to it instead

also remove the autostart from the rstore, since we only want to start
it when we change to the relevant tab

and add icons for all other datastore tabs

Signed-off-by: Dominik Csapak <d.csapak@proxmox.com>
2020-10-27 17:41:30 +01:00
Thomas Lamprecht 6ab77df3f5 ui: some more eslint auto-fixes
Signed-off-by: Thomas Lamprecht <t.lamprecht@proxmox.com>
2020-09-25 18:47:25 +02:00
Dominik Csapak 97af919530 ui: syncjob: make some columns smaller
Signed-off-by: Dominik Csapak <d.csapak@proxmox.com>
2020-08-13 11:51:47 +02:00
Dominik Csapak c91602316b ui: syncjob: improve task text rendering
to also have the correct icons for warnings and unknown tasks

the text is here "ERROR: ..." now, so leave the 'Error' out

Signed-off-by: Dominik Csapak <d.csapak@proxmox.com>
2020-08-13 11:51:35 +02:00
Dominik Csapak 8d78589969 improve display of 'next run' for sync jobs
if the last sync job is too far in the past (or there was none at all
for now) we run it at the next iteration, so we want to show that

we now calculate the next_run by using either the real last endtime
as time or 0

then in the frontend, we check if the next_run is < now and show 'pending'
(we do it this way also for replication on pve)

Signed-off-by: Dominik Csapak <d.csapak@proxmox.com>
2020-06-04 07:03:54 +02:00
Dominik Csapak 86e432b0b8 ui: add SyncView
shows a nice overview of sync jobs (incl status of last run, estimated
next run, etc.) with options to add/edit/remove and also show the
log of the last run and manually run it now

Signed-off-by: Dominik Csapak <d.csapak@proxmox.com>